File Uploading

Please wait ...

0%


Tagab Union Construction Company

Details:

Our homeland Afghanistan during the two decades of war has suffered from a lot of setbacks .Much of the urban and rural are of our country were destroyed forcing million of Afghanis to leave their home and settle in the neighboring countries traditional community structure have sustained severe damage .in some areas beyond repair .War has destroyed much of the schools and others community infrastructures .Data for ten year back indicates that only four out every ten school have school premises and many of the existing building need rehabilitation or major repair .Aftermath of 11th September and changing political situation in the country also the international society paid it attention mainly to reconstruction and rehabilitation a panel of experienced and patriotic engineers and some other experts made a decision to take active part in this process.Therefore the above mentioned panel of highly qualified engineer and expert tried to established a construction company in order to be actively involved in the country reconstruction and rehabilitation process.Tagab Union Construction Company is established on 17.01.2011 with enough expert staff that most of them are experienced engineers .The aim is to participate in the reconstructionconstruction of this war ravaged country and provide high quality services to this miserable nation and perform high quality national and international accepted construction activities and become one of the leading construction company in the world


Products / Services:

Changing Environment of the Construction FiledThe construction industry is a cluster of diverse fields and participant that have been loosely lumped together as a sector of the economy .The construction industry plays a central role in national welfare including the development if residential housing office buildings and industrial plants and restoration of the nations infrastructure and other public facilities The importance of the construction industry lies in the function of its products which provides the foundation for industrial production and its impacts on the national economy can not be measured by the value of its outputs or the numbers of persons employed in its activities alone.This field becomes even more vital when we see it in afghan context where professionalism is a rare commodity and the demand for the construction is very high. A huge a mount of international aid is spent on construction related activities each year. Those who pay close attention to the peculiar characteristics of the construction industry and its changing operating environment will be able to take advantage fo the favorable conditions and to avoid the pitfalls. Several factors are particular noteworthy because of their significant impacts the quality cost and time of construction.New TechnologiesIn recent years technologies innovation in design material and construction methods have been resulted in significant changes in construction costs. Computer aids have improved capabilities for generating quality design as well as reducing the time required to produce alternatives designs. new material not only have enhanced the quality of construction but also have shortened the tine for shop fabrication and field erection construction methods have gone through various stages of mechanization and automation in Afghanistan .including the latest development of construction robotic .Labor ProductiveThe term productive is general defined as a ratio of the production output volume to the input volume of resources Since both output and input can be quantified in a number of ways .there is no single measure of productivity that is universally applicable .particular in the construction industry where the products are often unique and there is no standard for specifying the levels for aggregation of data. how ever since labor constitutes a large part of the cost of construction .labor productivity in terms of output volume per person hour is a useful measure .Labor productivity measured in this way does not necessary indicates the efficiency of labor alone but rather measures the combined effects of labor equipment and other factor contributing to the output .Public ScrutinyUnder the present divisive climate in the Afghanistan .the public is increasingly vocal in the scrutiny of construction project activities particularly in difficult regions such as east and south. Sometimes it may result in consideration difficulty in sitting new facilities as well as additional experience during the construction process itself TUCC is fully prepared to manage such crises in order to meet the minimum requirement sit by the contractors CompetitionA final trend which deserves not is the increasing level of country wide competition in the constructing industry .Contractors are likely to find non-traditional firms biding for construction work particularly on large management and improved productivity are more and more important .TUCC planning process ________________________________________Construction planning is a fundamental and challenging activity in the management and execution of construction project .it involves the choice of technology the definition of work tasks the estimation of the required resources and duration for individual tasks and the identification of any interactions among the different work tasks .A good construction plan is the basis for development the construction plan is a critical task in the management of construction even if the plan is not written or otherwise formally recorded . In addition to these technical aspects of construction planning It may also be necessary to make organization decisions about the relationships between project participant and even which organization to include in a project .For example the extent to which sub-contractors will be used on a project is often determine during construction planning MONITORING EVALATIONTUCC has a very strong monitoring and evaluation system in place for all the projects that are awarded to us .At TUCC a proactive approach and plan based monitoring and evaluation system in considered a key element for the success of any project that is the reason that each of our proposal contents a flexible monitoring plan.Monitoring and evaluation of project provides us with better means for leaning from past experience improving services delivery planning and allocating resources and demonstrating result as part of accountability to key stakeholder . Some of the techniques and tools of monitoring and evaluation that we use arePerformance Indicators The logical framework approach Theory based evaluation Formal surveys Rapid appraisal methods Expenditure tracking system Participatory methods Cost benefits and cost effectiveness analysis Impact evaluation


Capabilities:

Company Information Package WORKING PROCEDURE OF EACH SECTION 1-Managing section Managing section is consisting of director and Asset. Director of Company they have the following responsibilities Fund rising Approval of all Contracts Magnification of Company Check and approval of all finance record Managing and organizing of office and project admin and operational Department Assisting work to the sections Signing of leaves Checking the office and project work and progress Check the reports Attendant of the meeting Executive board Director of Construction Company assessment director admin and accountant operational manager designer and architecture are the member of this Board This board meets every Thursday in the evening at 400PM Each member of the board will present his activities for the last week and plan for the next week They make decision for the problems rise in the company area of work hiring termination Bonus development of company and other things relates to the construction company.Company Director or Assistant Director has to be present Company Director will make final decision.70 of idea in the Board will be accepted Minute of the meeting will be delivered to the members of board one day in advance Record of the meeting will be kept in the filedAt the time there is need for meeting other then Thursday the meeting will be taken 3- Admin and Finance The following responsibilities this section has Creation of Clear System for Finance Keeping records of finance for each project and officePaying of Salaries.Paying all the approved BillsPreparation for formats for Contract staff contract office vehicles machinery work construction material Formats for Stock stock Book stock cards Records of all Contract Creation of system for issuing and receiving material In and out Letters contact with outsideSchedule for meeting Office kitchen cleaning security Attendance sheet for the staff of the company records of leaves Paying telephone electricity office rent and water Banking system Preparation of workshop and courses for the staff Filing of system of company In case of need of loan the company can provide loan for its staff and they will repay the loan by the identified installments4- Consultancy sectionThe following capacity building can be provided to other companies and Organization by this department with feesWriting proposalsWriting reportsPrinciple of Surveying Project management Methods of effective Monitoring System creation Management Technical programs of computer Admin Accountant This Department can provide following services for other companies and organization with a fees Writing proposal for projectsWriting reports for project sSurviving and Deign of projects Paying fee by the company or organization will provide these services Technical and operational section It is operational section and implements the projects the following are the responsibilities if this section Preparation of work plan estimation of labors work for equipment machinery material for each project Preparation for the list for material to be purchased Monitoring of project staffLineup of Transportation work Checking and signing of purchased order Monitoring of project Report to Director weekly monthly final and update project works every day Keeping all implementation records6-Architecture Design and estimating Section These tow positions are working together in estimation tow engineers they have graduated from engineering faculty Architecture Civil are acceptable .they may have some computer knowledge.typical drawing of school and Clinic 6 building multiple story building and the all the drawings relates to the project the drawing for local people government construction companies and organization design of the aforementioned drawings estimation of aforementioned drawings work plan for each drawing Update the standards in drawings design and estimation


Categories

Project Design and Implementation:

  • Light Manufacturing
  • Private Enterprise Development
  • Construction and Engineering Works
  • Environment and Natural Resources
  • Education, Training, Capacity Building
  • Health and Human Services
  • Monitoring and Evaluation

Business Consulting:

  • Business and Financial Planning
  • Market Research and Surveys

Industry Specific and Technical Services:

  • Engineering and Architectural Services
  • Environmental and Natural Resources Services
  • Construction and Construction Management
  • Technical Testing and Analysis
  • Other Professional Technical Activities
  • Other Professional Technical Activities

General Services Contractors:

  • General Repair, Maintenance and Installation of Machinery and Equipment
  • Repair and Maintenance for Generators, Pumps, and other Electrical
  • Electricity, Gas, Air Conditioning and Heating
  • Water Treatment and Supply, Plumbing
  • Waste Collection and Waste Management
  • Food and Beverage Services, Catering

Workplaces

  • Badakhshan
  • Baghlan
  • Kabul
  • Kapisa
  • Kunar
  • Kunduz
  • Laghman
  • Nangarhar
  • Panjsher
  • Parwan
  • Uruzgan
  • No Feedback To Show

    No Opportunity To Show

    Organization Info

    Phone: 0093787105957
    Email walid.ahmad83@gmail.com
    Street: House10075 4th street Ahmad shah mina
    City: Kabul
    Province: Kabul
    Country: Afghanistan